I have a single backup plan in place (Block-level, Real-time backup). Each day I get two emails from MSP. One indicates a successful backup, the other indicates a failure. They arrive within minutes of each other. When I look at the History in MSP, I don't see any indication of a failure.
The failure message says (in part):
ERROR
Terminated Abnormally (code: 1023)
The plan was interrupted abnormally
It looks to me as if this error email is spurious (since I don't see any evidence of it in the History tab in the MSP 360 application), so I am curious as to what is causing this?