I have a customer I use hybrid jobs on to backup first to a local hard drive and then to a NAS device. I setup the job through the local GUI on that server. If I try to edit the job from the MSP dashboard, it switches the secondary target (the NAS drive) to my cloud account and there is no way to change it. This never happened before.
I edit through the MSP console so that I can enable email and event log alerts on jobs. Is there a way to turn those on without editing through the MSP console? Can the MSP console be fixed so this isn't a problem?